+86-574-87883895

Die Casting For Water Heater Parts

Products Mode:
Place of Origin: NingBo, China
Brand Name: Fuerd
Model Number: OEM
Material: ADC12, A380, A360, A413, 3#, 5#, 8# Zinc alloy
Method: Die Casting
Cavity: Single or Multiple
Surface treatment: Sand blast, powder coating, shot blast, e-coating
Color: Custormer's Requirements
Size: Customer's 2D/3D Drawing
Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
Certification: ISO9001:2015 / IATF16949
MOQ: 100pcs
Supply Ability: 50000 Piece/Pieces per Month
Port: Zhejiang, China

Description

Die Casting For Water Heater Parts

By using a full scientific excellent administration method, great quality and fantastic religion, we get good reputation and occupied this discipline for Die-Casting Aluminum A380 Engine Parts Water Pump Housing, The product will supply to all over the world, Only for accomplishing the good-quality product to meet customer's demand, all of our products have been strictly inspected before shipment. We always think about the question on the side of the customers

IATF16949&ISO 9001 CERTIFIED
FUERD was founded in 1987 with a small die casting tooling and die casting facility located in Ningbo. Today, the company has become one of the largest and most diversified die casting companies in the China. FUERD grew considerably and built an expert in large, thin-walled die castings serving the lighting and auto industries.

✧ Products Description:

Mold Material SKD61, H13
Cavity Single or multiple
Mold Life Time 50K times
Product Material 1) ADC10, ADC12, A360, A380, A413, A356, LM20, LM24
2) Zinc alloy 3#, 5#, 8#
Surface Treatment 1) Polish, powder coating, lacquer coating, e-coating, sand blast, shot blast, anodine
2) Polish + zinc plating/chrome plating/pearl chrome plating/nickel plating/copper plating
Size 1) According to customers' drawings
2) According to customers' samples
Drawing Format step, dwg, igs, pdf
Certificates ISO 9001:2015 & IATF 16949
Payment Term T/T, L/C, Trade Assurance


✧ Packaging Details:
1. Plastic bag with the pearl-cotton package. 
2. To be packed in cartons. 
3. Use glues tape to seal cartons. 
4. Deliver out by sea or air. 
Or according to customers' requirements.
Each carton less than 15kg.

✧ Lead Time:

Quantity(Pieces) 1 - 3000 >3000
Est. Time(days) 25 To be negotiated


✧ Equipment:
 

Product DFM

Mold Making

Centralized smelting

Die casting

Casting monitoring

Automatic polishing

Shot blasting

CNC Machining

Ultrasonic cleaning

Tensile testing

Spectrum analyzer

X-Ray:Check the shrinkage sand hole inside the produc

CMM:Check the product position, parallelism, isometric tolerance and dimension

Final inspection line

Standard Or Custom Packing

 

✧ Why cloose us:

  • 1. Engineering Designing
    Innovatived tooling designs engineered and optimize your new and existing parts...at FREE COST to You!

  • 2. Lower Tooling Costs
    Quickly soft tooling to make under 1000 part for your testing to avoid die casting mold investment risk and saving product test time!

  • 3. Lower Part Costs
    Automatic and manually die casting production process to save part costs.

  • 4. Assembly line
    Final assembly line to make sure all parts good fitting together for whole project requirement.

  • 5. Customer Service
    Professional project engineer directly work with your designing engineers from the designing stage through product delivery.

  • 6. Reliable Quality
    Integrated Quality Management system IATF16949 & ISO 9001 certified from RFQ to delivery to control of good quality.

  • 7. On-time Delivery
    Above 98% of molds and product can be shipped on time.

  • 8. Manufacturer experience
    More than 35 years manufacturer experience with satisfied customers.

 

✧ FAQ:

  •   1. Are you a manufacturer or a trading company?
    We are factory that provide mold ,die casting, CNC and all process related .
  •   2. How to quote?
    Received the sample or drawing in CAM/STP/IGS form, then we will make the quotation.
  •   3. What kind of production service do you provide?
    Mold making, die casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.
  •   4. What's the production time for new molds and mass production?
    30-60 days to make the new moulds, mass production takes around 30-45 days, also we can speed up process urgently if need.
  •   5. Payment terms
    Tooling cost:  TT 50% with order, the balance after sample approved.
    Mass production:  TT 50% with order, the balance at sight of B/L
  •   6. How about the packing?
    Both standard and customized will be available.