- Sliding Screw Insertion Technique
- surgeons will often elect to insert a sliding hip screw along with a single cannulated screw;
- motivation for the addition of a cannulated screw is to prevent rotation of the proximal fragment;
- problem w/ this type of fixation is that the cannulated screw will prevent fracture impaction and may lead to fracture non union;
- in the following example, the reduction is not optimal and the cannulated screw may prevent further fracture impaction;
- hemiarthroplasty:
- may be indicated for some patients w/ basilar neck fractures, but often it is not the surgeon's first choice due to the risk of joint sepsis;
IATF16949&ISO 9001 CERTIFIED
FUERD was founded in 1987 with a small die casting tooling and die casting facility located in Ningbo. Today, the company has become one of the largest and most diversified die casting companies in the China. FUERD grew considerably and built an expert in large, thin-walled die castings serving the lighting and auto industries.
✧ Products Description:
Information table | |
Materials | Metal:Titanium, Aluminum, Stainless steel & Steel, Brass |
Plastic:POM, PEEK, ABS, Nylon, PVC, Acrylic, etc. | |
Processing | CNC turning, CNC milling, CNC turn-milled, Laser cutting |
Surface Treatment | Powder Coated, (Ordinary & Hard) Anodized, Electropolished & Polished, Plating, |
Bead Blasted, Heat treatment, Passivate, Black oxidate, Brushing, Laser engraving | |
Tolerance | +/-0.005mm |
Lead Time | 1-2 weeks for samples,3-4 weeks for mass production |
Quality Assurance | IATF16949&ISO 9001 CERTIFIED |
Drawing Accepted | Solid Works,Pro/Engineer, AutoCAD(DXF,DWG), PDF |
Payment Terms | Trade Assurance, TT, Paypal, WestUnion |
✧ Packaging Details:
1. Plastic bag with the pearl-cotton package.
2. To be packed in cartons.
3. Use glues tape to seal cartons.
4. Deliver out by sea or air.
Or according to customers' requirements.
Each carton less than 15kg.
✧ Lead Time:
Quantity(Pieces) | 1 - 3000 | >3000 |
Est. Time(days) | 25 | To be negotiated |
Product DFM |
Mold Making |
Centralized smelting |
Die casting |
Casting monitoring |
Automatic polishing |
Shot blasting |
CNC Machining |
Ultrasonic cleaning |
Tensile testing |
Spectrum analyzer |
X-Ray:Check the shrinkage sand hole inside the produc |
CMM:Check the product position, parallelism, isometric tolerance and dimension |
Final inspection line |
Standard Or Custom Packing |
✧ Why cloose us:
1. Engineering Designing
Innovatived tooling designs engineered and optimize your new and existing parts...at FREE COST to You!
2. Lower Tooling Costs
Quickly soft tooling to make under 1000 part for your testing to avoid die casting mold investment risk and saving product test time!
3. Lower Part Costs
Automatic and manually die casting production process to save part costs.
4. Assembly line
Final assembly line to make sure all parts good fitting together for whole project requirement.
5. Customer Service
Professional project engineer directly work with your designing engineers from the designing stage through product delivery.
6. Reliable Quality
Integrated Quality Management system IATF16949 & ISO 9001 certified from RFQ to delivery to control of good quality.
7. On-time Delivery
Above 98% of molds and product can be shipped on time.
8. Manufacturer experience
More than 35 years manufacturer experience with satisfied customers.
✧ FAQ: